About Me.

Short description.

Mihai Theodor Sava

Architect

Main projects:
Pedestrian Bridge in Mamaia, Constanta – “Navod si Pescarus”​
Pedestrian Bridge in Galati – “Time Gate”
Art department – building the set for – “Adam Resurrected

– Creating the designs of the Architectural project and managing the aesthetics of other engineering projects;
– Development of 2D drawings and 3D rendering presentations for a good understanding of the projects;
– Feasibility Studies for the acquired projects;
– Producing the detailed drawings of the projects in collaboration with structural engineers;
– Collaboration with the factory technicians, to develop construction elements.
– Attending meetings on sites;
– Responsible for specifying the nature and quality of materials required.

Partners: